Subscribe via RSS Feed
Subscribe to receive regular blog updates

The Retreat as a Board Capacity Building Vehicle

June 8, 2020 0 Comments

Experience has taught me that a retreat involving your school board and senior administrators can be a powerful tool for building your board’s governing capacity and strengthening the board-superintendent partnership.  But – and it’s a really big caveat – you’ve got to make sure the retreat is well-designed.  Otherwise, it could fall apart, at the expense of the superintendent’s credibility.  The following keys to a successful retreat are drawn from Chapter Six of my new book, Building a High-Impact Board-Superintendent Partnership:  11 Critical Questions You Need to Answer.

  • Create an ad hoc Retreat Steering Committee headed by the board president/chair and consisting of two to three other board members and the superintendent – making sure that the Committee is as diverse as feasible in terms of being representative of the board’s composition and board members’ viewpoints.
  • Retain a consultant/facilitator with substantial governance expertise and experience to provide high-level support.
  • Have the consultant/facilitator develop – on the basis of interviews and review of governance documentation – a detailed retreat design consisting of specific retreat objectives, a description of the retreat structure (including detailed descriptions of the breakout groups that will be employed), and the blow-by-blow agenda and present the design to the Steering Committee.
  • Ensure that the retreat design includes several breakout group sessions led by board members to ensure active engagement – typically two to three groups meeting concurrently in each of two to three breakout group rounds (for a total of four to nine different breakout groups over the course of the day).
  • Make sure the consultant/facilitator provides the board members who will be leading the breakout groups with a detailed orientation on their role and their groups’ tasks so that they will succeed in leading their groups.
  • Distribute the retreat design – in the form of a memorandum from the Steering Committee members and the consultant/facilitator – to all retreat participants at least a week in advance of the retreat.
  • Preserve and transcribe the breakout group worksheets, which the consultant/facilitator should draw on in writing the action report following up on the retreat.
  • Involve the Steering Committee in reviewing and finalizing the consultant/facilitator’s action report draft, transmitting the action report to all retreat participants in the form of a memorandum for the Steering Committee and consultant/facilitator.
  • And have Steering Committee members present the action report recommendations to retreat participants in a special work session and have participants formally approve the action recommendations, typically by adopting resolutions moved by the Steering Committee.

I have found that the peers-presenting-to-peers approach works extremely well in securing board approval for such board capacity building recommendations as fashioning a board governing mission describing the board’s detailed responsibilities and adopting an updated structure of board standing committees, a set of standing committee operating guidelines, an updated set of board member governing performance standards, and a new process for board evaluation of superintendent performance.  However, be advised that meticulous preparation is critical to success, including:  developing PowerPoint slides for the presentation and making sure Steering Committee members participate in a rehearsal session prior to the formal presentation so that they are comfortable with the slides and have an opportunity to discuss how to address anticipated questions.

Doug Eadie
Please follow and like us: